Submission completes the initial editing stage and commissions verification by IBU. Take this step once content, documents and internal authorisation are ready.
1. Check readiness for submission
Check the EPD preview, background report and evidence. Ensure all files reflect the same technical version. Agree fees and responsibilities internally.
2. Use the responsible project account
Open the EPD with the appropriate permission. Submission is assigned to the person responsible for the project or IBU. If you only have editing rights, coordinate the handover with the project lead.
3. Send for verification
Choose the action to send for verification. Address any completeness messages and read the declarations in the confirmation dialog. Confirm the order only once the information and prerequisites are correct.
4. Check status and next tasks
Check the EPD status afterwards. A status indicating submission for verification marks a handover, not completed verification. Keep specialists available for questions. Following a return for revision, use the designated reverification step to resubmit.